Traditional contract: appointment
This stage describes the process of making appointments, such as: independent client advisers, members of the consultant team, site inspectors and so on. This stage is likely to be repeated a number of times during the project.
For information about selecting the contractor, see: Traditional contract: detailed design.
Contents |
[edit] Identifying the need to make appointments.
The client identifies the need to make an appointment. In some cases, existing consultants may identify a requirement and bring this to the attention of the client.
The client may decide they need advice or assistance from independent client advisers or from existing members of the consultant team to help them make the appointment.
The client determines the selection procedure that will be adopted. This might be a process of recommendation, research and interview, open competition (with or without design), selective competition (with or without design), or an existing relationship such as a framework agreement. The client may have to follow a pre-determined procedure if there are in-house rules governing appointments, if they are a local authority or other public body, or if the project will be publicly funded. Such procedures may include assessing whether OJEU procurement rules are likely to apply, which can cause significant delays unless implemented early in the project, as the procedures that must be followed are quite lengthy.
[edit] Agreeing the exact nature of appointments required.
The client agrees the wording of any adverts that are required (such as OJEU adverts) and if appropriate prepares a pre-qualification questionnaire. If it has not already been done, the client prepares documentation describing the nature of the development (such as a strategic brief).
The client defines the schedule of services that will be required, along with selection criteria, form of appointment and contract terms for the appointment. The schedule of services might include services that are not included on standard forms of appointment, or may be considered 'additional services'. Additional services could include: post-occupancy evaluation services, the use of building information modelling, the preparation of an outline planning application and so on.
The client prepares a formal request for proposals. If design proposals are requested, it is best practice to offer payment to candidates. This ensures that candidates give their full attention to preparing their proposals (which is in the best interests of the client) and ensures that the candidates feel they will be treated fairly by the client.
[edit] Preparing a list of possible candidates.
The client prepares a long list of possible candidates, either from recommendations, existing relationships or expressions of interest received in response to adverts.
The candidates may be required to complete a pre-qualification questionnaire, or there may be some other assessment procedures (such as interviews) that results in the preparation of a short list invited to submit proposals. Such assessments may include; evaluating experience and capability, checking professional indemnity insurance, assessing CDM competence, checking references and so on. Short-listed candidates are invited to submit consultant's proposals in response to the client's request for proposals.
[edit] Selecting the preferred candidate and making the appointment.
The client collates responses to queries from candidates and issues these responses to all candidates.
The client receives and opens the consultant's proposals and makes a record of the fee proposals of each candidate. In some circumstances, fee proposals may be submitted in a sealed envelope and opened separately from the rest of the consultant's proposals so that the assessment procedure is not initially prejudiced by the fee (which it may be possible to negotiate down).
The client assesses the consultant's proposals. They may seek advice from existing consultants or independent client advisers to help them do this.
The client invites the candidates to interview, identifies the preferred candidate(s) and opens negotiations with the preferred candidate(s).
The client appoints the selected candidate and if appropriate arranges a consultant team start-up meeting.
The client informs other candidates that they have been unsuccessful. It is best practice to give clearly thought-out, specific feedback to unsuccessful candidates as they have taken the time to prepare proposals, often for no fee. Candidates greatly appreciate this feedback and will be more likely to express interest in future projects.
Featured articles and news
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.
Internally insulating a historical building
An experimental DIY approach using mineral thermal lime plaster.
Tree species selection for green infrastructure: A guide for specifiers.
The future of the Grenfell Tower site
Principles, promises, recommendations and a decision expected in February 2025.